Stamping and Metal Forming Industry Solution

End-to-end digitalization around presses, dies, changeovers and batch traceability connects blanking, stamping, inspection and warehousing, making the stamping shop transparent, controllable and measurable.

Four typical challenges in stamping shops

Presses are highly automated, but planning, die, equipment and quality data are fragmented, and management granularity struggles to match high-mix low-volume delivery rhythms.

Frequent changeovers

High-mix low-volume, changeovers eat capacity

Small order batches and many variants mean die changes and setup repeatedly interrupt production, with changeovers consuming a large share of effective stamping hours.

Die management

Coarse die life management

Issuing, maintenance, grinding and scrapping rely on paper ledgers. Remaining life and cumulative strokes are opaque, so abnormal wear often turns into batch quality incidents.

Equipment statistics

Hard to track strokes and utilization

Strokes and running status are recorded by manual meter reading or estimated afterward. Utilization and cycle-time data are unreliable, unable to support real capacity assessment or scheduling decisions.

Quality traceability

Heavy batch quality traceability pressure

Material batches, dies, equipment parameters and personnel are recorded separately. When batch defects or complaints occur, tracing is slow and root causes are hard to pinpoint.

End-to-end digitalization from blanking to stamping, inspection and warehousing

With Qicheng MES at the core, orders and scheduling connect from above while press, die and inspection data connect below. Every step in the stamping shop joins one data backbone, making plans executable, processes monitorable and results traceable.

  • Blanking and dispatch: Bind coil or sheet batches to work orders and assign tasks automatically based on press capability and die status.

  • Stamping execution: Automatically capture strokes, cycle time and equipment status, calculating utilization and cumulative die strokes in real time.

  • Inspection and warehousing: Record first/last-piece and patrol inspection data online, warehouse conforming parts by batch and form a complete traceability chain across material, die, equipment and personnel.

Qicheng MES · Stamping shop dashboard

Today's strokes

126,840

↑ 5.4%

Equipment utilization

87.2%

↑ 3.1%

First-pass yield

98.9%

↑ 0.8%

Press load distribution

Real time

Die life warning

M-2218

Cumulative strokes have reached 92% of die life; schedule grinding after this shift.

Change
AI

Xiaocheng AI suggests moving WO-2085 from Line 3 to Line 5, estimated to cut changeover time by 12 minutes.

Six core application scenarios

From dies to equipment and from changeovers to traceability, each high-frequency stamping shop management action is addressed.

01

Full die lifecycle management

Create an electronic record for each die covering receiving, issuing, mounting, maintenance, grinding and scrapping, with remaining life and cumulative strokes visible in real time.

  • · Online die ledger, drawings and history
  • · Life threshold alerts and automatic maintenance reminders
  • · Automatic linking of dies to work orders and equipment
02

Rapid changeover management

Break changeovers into standard actions and time standards, record each changeover duration against standard, identify bottleneck actions and continuously shorten changeover time.

  • · Digital changeover SOP with step confirmation
  • · Automatic changeover time tracking and ranking
  • · Merge similar work orders in scheduling to reduce changeovers
03

Stroke and equipment utilization capture

Capture press strokes and run/stop/alarm status directly through an IoT gateway, automatically calculating utilization, cycle time and OEE instead of manual recording.

  • · Real-time stroke counting with shift-based statistics
  • · Categorized downtime capture with quantified losses
  • · Compatible with mainstream PLCs and legacy equipment retrofits
04

Batch-level quality traceability

Use the batch as the thread through material, die, equipment parameters and inspection data. Trace forward to destinations and backward to sources, cutting complaint traceability from days to minutes.

  • · Two-way binding of material heat numbers and finished-goods batches
  • · Online records for first/last-piece and patrol inspection data
  • · One-click impact scope for quality issues
05

Intelligent scheduling

Generate schedules automatically from due dates, press tonnage, die availability and changeover time. Rush orders are rescheduled in seconds, steadily improving on-time delivery.

  • · Multi-constraint optimization balancing delivery and machine load
  • · Merge work orders using the same die to reduce changeovers
  • · Visual scheduling rationale with planner fine-tuning
06

Predictive press maintenance

Build equipment health models from vibration, current, temperature and lubrication status, warning of potential failures in advance and turning emergency repairs into planned maintenance.

  • · Equipment health scoring and remaining useful life prediction
  • · Early fault warnings shift maintenance from reactive to proactive
  • · Spare parts demand forecasting for better inventory

Quantifiable results

Figures below are averages from live stamping customers; actual results vary with factory foundations and management maturity.

+18%

Monthly capacity increase

-22%

Changeover time reduction

-45%

Unplanned downtime reduction

100%

Batch traceability

Implementation results in stamping

Real improvements from structural parts, metal forming and other application scenarios.

Customer case · automotive structural stamping

An automotive structural parts stamping plant

After deploying Qicheng MES and Xiaocheng AI scheduling, die life warnings replaced reactive repairs, changeover actions were standardized and complaint traceability dropped from 2 days to 10 minutes.

+18%

Monthly capacity

-22%

Changeover time

10minutes

Batch traceability

Customer case · metal forming

A precision metal forming company

With IoT equipment data and predictive maintenance, press utilization became transparent, unplanned downtime fell significantly and OEE rose from 68% to 81%.

-45%

Unplanned downtime

81%

Equipment OEE

98.9%

First-pass yield